Hi All,
Need urgent help,
Scenario is as below :
Release strategy is set 2 level for >5000
Level 1
Level 2
For =<5000
Level1
Level 2
Level 3
IF PR contains less line item >5000 the release strategy gets triggered@ 2 level. (Procedure with Classification has been set here hence for each line item release strategy gets triggered based on the valuation in PR. IF line item is >5000 then 2 level release strategy and if valuation of the line item is more than <= 5000 then the item goes to 3 level approval.
I need if the PR contains the 3-4 line items & if atleast 1 line item has valuation =< 5000 the all line items in the PR should go to last level of approvel.
Please suggest